PACKAGES AND PRICES

What we build.

Three packages, priced the same way for everybody. Your house will land somewhere in the range shown, and the written price you get at the assessment is the number we build to.

THE ACCESSIBLE WEDGE

The Conversion

on site 5 to 6 days

  • Tub and surround out, wet wall opened to the studs

  • Framing and subfloor repaired as found

  • Sheet membrane waterproofing over cement board

  • Curbless shower pan built in mortar, linear drain

  • Wall tile to the ceiling

  • Thermostatic valve, rain head, handheld shower on a slide bar

  • Solid blocking and two grab bars set into the framing

  • Frameless glass panel

  • Vanity, toilet, floor and lighting stay as they are

Who it is for
The tub is the problem

THE WHOLE ROOM

The Full Bath

on site 8 to 10 days

  • Everything in The Conversion, plus:

  • Floor tile throughout, heated mat optional

  • New vanity, quartz top and faucet

  • Comfort height toilet

  • New vanity light, recessed can light, vented exhaust fan

  • Drywall repair, prime and paint

  • New trim, door hardware and accessories

Who it is for
The room is tired, not just the tub

PRIMARY SUITES

The Primary

on site 15 to 20 days

  • Full gut to the studs, layout changes allowed

  • Relocated plumbing and drain lines

  • Double vanity, custom tile layout

  • Niche, bench, curbless wet room option

  • Heated floor as standard

  • Linen and closet reconfiguration as needed

Who it is for
Moving walls and plumbing

Every bathroom is different. Size, layout, what is behind the wall and what you choose to put back all move the number, which is why we quote each one on its own rather than printing a headline price that turns out to be wrong for your house.

IN EVERY PRICE

Four things that are
included and usually are not.

$1,200

A stated allowance for hidden damage. Every price carries it. We tell you it is there on day one instead of discovering it on day four.

Permits

Pulled and paid. Summit County Building Standards for Akron jobs, and whatever your township requires for the rest.

Clean up

Dumpster, floor protection and daily tidy. The house you live in stays liveable while we are in it.

Warranty

Workmanship in writing, not just the manufacturer's product warranty on a box of tile.

HOW WE KEEP THE PRICE HONEST

Four rules, and we say them
out loud at the assessment.

Fixed price remodeling goes wrong because of scope creep, not because of the original number. These are written into the contract so nothing is a surprise later.

01The allowance is stated, not hidden

$1,200 is carried in your price for what we find behind the wall. If the damage costs more than that, you see the photograph and sign a change order before we carry on. If it costs less, the balance stays in your job, not our pocket.

02Selections close before demolition

Tile, vanity, fixtures and paint are chosen and ordered before the first day. A bathroom where someone is still deciding on tile on day four is how a nine day job turns into a sixteen day job.

03Moving plumbing makes it a Primary

The moment a toilet or a drain relocates, the job is in the top package. We will tell you that at the assessment rather than starting a Full Bath and renegotiating halfway through.

04One bathroom at a time

If this is the only bathroom in the house, we will say so at the assessment and talk through what the week actually looks like. That conversation belongs before the deposit, not on day two.

NOT INCLUDED

What is outside
these prices.

Being clear about this up front is cheaper for both of us than arguing about it later.

  • Asbestos or mould abatement, if testing finds either. It is a licensed specialty and it gets quoted separately.

  • Whole house plumbing or electrical upgrades. If your panel or your supply lines need work to make the bathroom legal, that is a separate line.

  • Structural work beyond the bathroom footprint.

  • Moving a wall or a window, unless it is written into a Primary.

  • Anything you supply yourself. You can, but we do not warranty a fixture we did not buy.

Payment, and what we will not do

Forty to fifty percent at signing, a draw at rough-in, the balance when you are happy and the job is finished. Cheque or card.

What we will not do is put a price in front of you that expires at the end of the visit. Your written price is good for thirty days, and if you want to show it to your son or your daughter or another contractor, that is exactly what it is for.

Your bathroom, your number.

The prices on this page are what most houses land on. The only way to know yours is for one of us to stand in the room for an hour. That part is free.

THE DETAILS

What actually goes in.

The fittings and the finishes we use most. Specifics change job to job, and you choose them at the assessment rather than finding out on the invoice.

Eight close up photographs of bathroom details: a stainless grab bar, a fold down shower seat, a rain and handheld shower set, textured non slip floor tile, a lit recessed niche, a zero threshold shower entry, wood blocking behind the wall for grab bars, and an adjustable handheld on a slide bar

BB
BROTHERS BUILT
REMODELING

SAFER BATHROOMS. EASIER LIVING.

The work

What we build
How it works
Questions we get asked
Book an assessment

Where we work

Bath Township
Hudson
Fairlawn
Akron
All towns we cover

Get in touch

(330) 524-6989
[email protected]
Akron, Ohio
Monday to Friday, 7am to 6pm

© 2026 Brothers Built Remodeling LLC. Akron, Ohio.

Ohio Home Construction Service Supplier registration pending. Prices shown are typical project prices, not quotes.